In the Zone

We did move into this house with the understanding that we needed to get some critical work done. When we bought the house, we knew the first order of business would be to replace the electrical in order to meet insurance requirements and safety standards. Yes, all the electrical. Goodbye knob and tube, hello up to code standard wiring.

This slideshow requires JavaScript.

Although much of that work is behind the scenes, it affects every part of the house and those who are in it. We have been in the house for a couple of weeks, so I thought I would give you a glimpse of living in the zone (construction zone that is) where we are living under a constant layer of fine dust (cutting through plaster has a way of doing that).

This slideshow requires JavaScript.

Being at work all day we never know what to expect when we come home. We’re never quite sure what lights will work and what lights won’t or where a new hole in the wall or ceiling might appear. It wasn’t my favorite week when the dishwasher circuit was off. But, it was a day of awesomeness when I found out they had hooked up the washer and dryer !!

This slideshow requires JavaScript.

To be honest, I don’t think anyone has enjoyed the no air conditioning holding pattern we have been in especially on those days when it has been over 100 F.  When we first moved in (108 F), the air conditioning had been disconnected due to electrical work.  Then after deciding to replace some asbestos-lined ducts, it’s been out of commission well into this latest heat wave (101 F today). At least we have a back up “swamp” cooler that provides some relief when the temps drop a bit (e.g. late evening). Good news though – tomorrow we should return to the land of the breeze and the home of the cool.

This slideshow requires JavaScript.

With all this hole cutting, soon to be wall patching and painting, and floor refinishing going on, we can’t get too settled.  With most of our furniture in the garage, our boxes in storage, and our utility room/office not ready yet, we are are not completely unpacked.  During the first couple of weeks, we didn’t have access to our bedrooms (floor refinishing going on), so we slept downstairs in the sunroom and library.  Everything needs to remain in the middle of the rooms, so walls can be accessed for ongoing work.  As the electrical work moves upstairs, we may be moving back downstairs – that’s still to be determined.IMG_6268-1

Well, there is no lack of adventure while living in the zone.  We have front row seats to the progress going on around us.  We are also blessed to have the amazing crew from Dovetail Remodeling (http://www.dovetail-remodeling.com/) who we see bright and early every morning. Steve, Jim, Josh, and Justin work hard each day trying to figure out this old house and its many mysteries.  They are becoming very familiar with its nooks, crannies, and many construction idiosyncrasies.  This house has, in a very short period, thrown its share of construction curve balls, but the guys have risen to the occasion every time and haven’t struck out yet!

This slideshow requires JavaScript.

Advertisements

One thought on “In the Zone

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s